2024 Mill and Bond
Cherry Creek Schools values the support of our community and their continued investment in our students, staff, and facilities. As good fiscal stewards of taxpayer dollars, we aim to be transparent and accountable in the investments we make across the district.
Alongside our Interactive Bond Map, which shows school-by-school improvements since 2012, the dashboard below provides an at-a-glance look at 2024 bond projects across the district. You’ll find estimated budgets, construction schedules, and the latest updates. Learn more about the status of the 2024 bond and how your tax dollars are being put to work.
Terminology
These terms could be listed above and used during the phases of a project:
- Pre-Design: Research, space planning, and conceptual design
- Schematic Design (SD): Concepts are translated into physical drawings or visualizations that lay out the basic site and spaces but lack detail
- Design Development (DD): Drawings are refined to include details and precise dimensions along with coordination of structural, mechanical, electrical, and plumbing systems and material selections
- Construction Documents (CD): A final set of drawings and specifications with all necessary technical information included in order to obtain a building permit

